Oroco Private Placement Oversubscribed

NOT FOR DISTRIBUTION TO U.S. NEWS WIRE SERVICES OR FOR DISSEMINATION IN THE UNITED STATES

VANCOUVER, British Columbia – (February 12, 2025) Oroco Resource Corp. (TSX-V: OCO, OTC: ORRCF) (“Oroco” or the “Company”) is pleased to announce that the non-brokered private placement financing (the “Offering”) announced by the Company on February 5, 2025, is now oversubscribed due to strong investor demand.   As a result, the Company is no longer accepting new subscriptions and now intends to close the Offering, subject to the receipt of all necessary regulatory approvals, including the approval of the TSX Venture Exchange.

ABOUT OROCO

The Company holds a net 85.5% interest in those central concessions that comprise 1,173 hectares “the Core Concessions” of The Santo Tomas Project, located in northwestern Mexico. The Company also holds an 80% interest in an additional 7,861 hectares of mineral concessions surrounding and adjacent to the Core Concessions (for a total Project area of 9,034 hectares, or 22,324 acres). The Project is situated within the Santo Tomas District, which extends up to the Jinchuan Group’s Bahuerachi Project, approximately 14 km to the northeast. The Project hosts significant copper porphyry mineralization initially defined by prior exploration spanning the period from 1968 to 1994. During that time, the Project area was tested by over 100 diamond and reverse circulation drill holes, totalling approximately 30,000 meters. Commencing in 2021, Oroco conducted a drill program (Phase 1) at Santo Tomas, with a resulting total of 48,481 meters drilled in 76 diamond drill holes.

The drilling and subsequent resource estimates and engineering studies led to a revised MRE and an updated PEA being published and filed in August of 2024, which studies are available at the Company’s website www.orocoresourcecorp.com and by reviewing the Company profile on SEDAR at www.sedarplus.ca.

The Santo Tomas Project is located within 170 km of the Pacific deep-water port at Topolobampo and is serviced via highway and proximal rail (and parallel corridors of trunk grid power lines and natural gas) through the city of Los Mochis to the northern city of Choix. The property is reached, in part, by a 32 km access road originally built to service Goldcorp’s El Sauzal Mine in Chihuahua State.

Additional information about Oroco can be found on its website and by reviewing its profile on SEDAR at www.sedarplus.ca.

For more information, please contact:

Craig Dalziel, Chairman
Oroco Resource Corp.
Tel: 604-688-6200
Email: info@orocoresourcecorp.com
www.orocoresourcecorp.com

Neither TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the TSX Venture Exchange) accept responsibility for the adequacy or accuracy of this release.

Cautionary Note Regarding Forward-Looking Information

This news release includes certain “forward-looking information” and “forward-looking statements” (collectively “forward-looking statements”) within the meaning of applicable Canadian securities legislation.  All statements, other than statements of historical fact included herein, including, without limitation, statements relating to future events or achievements of the Company, the timing of closing of the Offering, proceeds received and use of funds of the Offering, are forward-looking statements.  There is no assurance that (i) the Company will be able to complete the Offering on the terms set out above, or at all, or (ii) that the proceeds of the Offering will be expended as contemplated. Many factors, both known and unknown, could cause actual results, performance or achievements to be materially different from the results, performance or achievements that are or may be expressed or implied by such forward-looking statements.  Readers should not place undue reliance on the forward-looking statements and information contained in this news release concerning these matters.  Oroco does not assume any obligation to update the forward-looking statements should they change, except as required by law.

Subscribe for Updates

These historical resource estimate models are based upon historical resource estimates prepared by John Thornton in 2011. While, in the opinion of Dane A. Bridge, author of the revised NI 43-101 standard technical report, Geology, Mineralization and Exploration of the Santo Tomas Cu-(Mo-Au-Ag) Porphyry Deposit, Sinaloa, Mexico dated April 21, 2020 (the “Report”), reliable estimation practices were used, in order to upgrade or verify the historical estimations, resampling and assay of historical drill samples, twinning of historical drill holes, and a new program of regularly spaced drilling is required. No qualified person has undertaken sufficient work to classify the current mineral resources or mineral reserves upon which these models are based and the Company is not treating the estimates as current estimates of the mineral resources. The Company gives no assurance that either these models or the historical resource estimates upon which they are based are accurate, and does not undertake any obligation to update the models or to release publicly any update or revisions of the resource estimates except as required by applicable securities law. The reader is cautioned not to rely upon these models or the historical resource estimates upon which they are based.

Please signify your understanding:

I Agree